Skip to content

Request a quote

Where is it and what has to go?

Describe what comes down, what stays and where the property is. Photos are good and drawings are better. We usually walk the lot before a quote is final.

Rather talk? Call (239) 510-4206, Monday to Friday, 10 to 6.

Give us a phone number or an email, whichever you prefer.

Photos (up to 5, optional)

Include the full building seen from the street, and anything that worries you. Drawings can follow by email.

Best way to reach you
News and offers (optional)

We will contact you about this quote the way you chose above, whether or not you tick the boxes below.

We use your message to scope and price the work, and to write back to you.

Questions

Questions about quotes

What goes into the cost of a demolition?

A quote comes after we visit the property, or after we review photos and drawings that show enough. The price follows the building's materials and height, the asbestos survey, utility and septic work, how machines reach the lot, what stays, and where the debris goes. We do not publish prices, because two lots that look alike seldom cost alike.

Is there a size limit on the jobs you price?

No limit. Sheds, pools, slabs and single walls get a quote, and so do whole buildings, selective or structural. Describe what stands on the lot and what must stay, and the price follows that description.

How long until work can begin?

That cannot be answered honestly before the facts are in. The start moves with permit review at your office, notice periods like the fourteen days Naples gives neighbors, historic review, utility and septic paperwork, asbestos findings and the weather. We hand you the order of work, with each dependency named, once those are known.

Call (239) 510-4206Request a quote